Route 0632 Corridor Improvement Project (SR 0632, Section 204)

Location:Scott Township, Lackawanna County, PAClient:PennDOT District 4-0Completion Date:Design: April 2025, Construction: October 2027 (Anticipated)Construction Cost:$2.2 Million (Estimated)Share

TPD was selected as Prime Consultant by PennDOT District 4-0 for this corridor improvement project along Route 0632 in Scott Township, PA.

The project involves improvements along SR 0632 from just west of Wemberly Hills Road to just east of Life Sciences Drive. The scope includes curve realignment, re- profiling, shoulder widening and improvements at the SR 0632/Wemberly Hills
Road intersection.

The overall project is designed to improve safety and operation along these corridors. The project is being funded through a Transportation Infrastructure Investment Fund (TIIF) Grant received jointly by Scott Township and the local Chamber of Commerce. The project is being managed by PennDOT District 4-0.

Project responsibilities include:

  • Data collection and analysis
  • Environmental Clearance
  • Alternatives analysis
  • Roadway Plans
  • Traffic Analysis
  • Traffic Control Plans
  • Signing and Pavement Marking Plans
  • Erosion and Sediment Pollution Control Plans
  • Post Construction Stormwater Management Plans
  • Waterway permitting
  • Right-of-Way Plans
  • Public involvement
  • Utility Coordination
  • Construction document preparation